Monday, June 29, 2026
HomeCloud ComputingNew Reporting Capabilities in VMware Cloud Director Availability 4.4

New Reporting Capabilities in VMware Cloud Director Availability 4.4

[ad_1]

We take into account good reporting to be important for Cloud Suppliers. Due to that, part of the brand new options in VMware Cloud Director Availability 4.4 goals to enhance the product’s reporting capabilities. There are two new reviews accessible to the Cloud Suppliers:

  • Restoration Plans Execution Studies
  • RPO Compliance

As an enhancement to the present Restoration Plans, in VMware Cloud Director Availability 4.4, we added monitoring and detailed reviews for his or her execution.

When testing or working a restoration plan, we are able to see extra particulars about every step, its progress, and its standing.

VCDA Recovery Plans Monitoring

The information for all executions – failed or profitable, assessments and runs are collected and made accessible as a report.  It may be generated by deciding on a restoration plan and clicking on Different actions > Studies.

VCDA List of Recovery Plans Reports

When a report is generated by a system or Group administrator, it accommodates details about the positioning, proprietor, standing, total execution period, and a drill-down per step. It may be simply downloaded from the browser as an HTML file.

VCDA Recovery Plan Execution Report

The reviews are stored for 3 months or till the Restoration plan is deleted. 

This new report, accessible from the Studies part, offers details about the RPO violations and after they occurred for one or all Organizations in a selected timeframe. Not like the Restoration Plans Execution Studies, it’s unavailable to tenants, and solely the system directors can generate it.

VCDA RPO Compliance Report

It may be configured to indicate solely violated or all replications, together with or excluding deleted protections or ones owned by the system group.

As soon as the report is generated to comprise the specified data, it may be exported as an HTML or TSV file. 

VCDA RPO Compliance Report HTML

RPO violations for protections of powered-off VMs and paused ones can even be included, however it isn’t indicated that that is the rationale for them.

The report consists of solely details about protections and never migrations.

Be aware: It is a best-effort report with an informative function solely as a result of it may not embody 100% of the violations as a result of some technical limitations. 

Keep in mind, to get the newest updates, verify this weblog usually, you can also discover us on Slack, Fb, Twitter, LinkedIn in addition to many demo movies and enablement YouTube, particularly our !



[ad_2]

RELATED ARTICLES

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Most Popular

Recent Comments